Yakai Mechanical Manufacturing Co.,Ltd
Produits
Diesel engines
  • 12hp vertical shaft 1 cylinder diesel engine
  • 25HP Inline Cylinder Diesel engine
  • 27HP Diesel engine
  • 25HP Diesel engine
  • Diesel generator
  • Lombardini diesel generator GA-LD310
  • Lombardini diesel generator GA-LD108
  • Lombardini diesel generator GA-LD106
  • 12.5kva Half closed diesel generator
  • Electric outboard
  • 60HP Electric outboard engine
  • 40HP Electric outboard engine
  • 20HP Electric outboard engine
  • 10HP Electric outboard engine
  • Diesel outboard
  • 35hp diesel outboard engine
  • 20hp diesel outboard engine for sale
  • 60hp diesel outboard engine
  • 30hp diesel outboard engine YAK30
  • Pump
  • Honda gasoline trash pump LP40TP
  • Honda gasoline trash pump LP30TP
  • 24HP water pump
  • Gearbox
  • Marine gearbox
  • Car gearbox with 2 cyl diesel engine
  • Car gearbox with 1 cyl diesel engine
  • Diesel inboard
  • Inboard diesel engine Water cooled
  • Inboard diesel engine Air cooled D40H
  • Inboard diesel engine Air cooled D20H
  • Industry
    The Qian Tang river yesterday closed across the board
    • The rain continued, Qian Tang river water surged. Yesterday morning, Hangzhou navigation area to start flood control level response. The three Fort lock fromyesterday 1 when, stop the ship out of the Qian Tang River, the Qian Tang Riverinto the inland river ship stop 5, Qian Tang River, Tonglu the Fuchun River damleg has been suspended. As of yesterday evening, Qianjiang stranded the ship 795, inland river ship detained 298 ships, canal Gongchen bridge to Fort threeleg against air ship lock. The water bus to continue in the suspended state.
    •  
    • The day before yesterday at four twenty-five in the afternoon, the seven Li Longrelease flood waters flow of 4970 cubic meters / second, Fenshui River release flood waters 350 cubic meters / second, Qian Tang River and then enter the two level of flood warning. Afternoon 5 when, Qianjiang bridge downstream waters to be control, all vessels are prohibited from entering the Qiantang River bridgedownstream waters, sea patrol boat control, the water inspection.
    •  
    • Is to the third stage 'pouring the Fuchun River lock expansion and renovationproject again suffer from floods. The day before yesterday at ten forty-five in the evening, the dam water level to 11.06 meters, higher than the cofferdam topelevation of 11 meters, in under the action of pit water surge, start. To yesterday morning 5 when, the whole construction area has been flooded.
    •  
    • According to historical data analysis, since the Fuchun River's August release flood waters since the establishment of the database, the number of only 12 times, the probability of release flood waters accounted for only 3%, since 2002 12 has not yet appeared August release flood waters of the.
    •  
    • Maritime authorities stopped the ship out of port visa, call waiting ships to avoid flood, on the area of ship through the early warning information release flood waters and the water level upstream notification GPS SMS situation
    Un conseil, un devis ?
    Title:   *
    Contact:  
    Tel:  
    Email:   *
    Fax:  
    Pais:  
    Mensaje: